Posted on Apr 4, 2021

Hydro Gas Ltd

CP12 Approved inspection hatch for consealed flues

Apr 4, 2021 – Mar 31, 2022
Having a boiler flue in avoid it is a fail for a landlord gas safety inspection.

Flues must have the correct size inspection hatch so the flue can be visually and physically inspected for defects and damage.

These hatches can be fitted in walls or ceilings, and can be painted over to match the surrounding decorations.
Show this code at the shop
Cp12 Hatch
Valid Apr 4, 2021 – Mar 31, 2022
Terms and Conditions
Site survey may be required
Contact Us
Message sent. We'll get back to you soon.